Kraków / Poland


01Introduction
Designed for the way business moves.
Orange Office Park is a Class A office complex of four buildings in Kraków. Built in phases, it lets tenants grow within the same location — even on the same floor — as floors between adjacent buildings can be linked.
Explore the Buildings4
Office buildings
A
Class standard
2,913m²
Typical floor plate GLA
150m²
Smallest lettable unit, from
Film 01In motion
Four buildings, one address.
Four Class A office buildings on Klimeckiego in Zabłocie, five minutes' drive from the Old Town.
02Architecture
Architecture with identity.

Terracotta-orange façades, a steady rhythm of windows and a glazed, tree-lined atrium give the park a presence that is instantly recognisable from the Nowohucka overpass.


Blue hour, Nowohucka St.
Film 02Arrival
Floors that grow with you.
Typical floor plates of 2,913 m² GLA, units from 150 m², and floors that can be linked between adjacent buildings.
- 01
Flexible floors
Premises of various sizes from 150 m², arranged to suit each organisation.
- 02
Linked buildings
Floors of adjacent buildings can be joined, so growth needn't mean moving.
- 03
Finished standard
Fully finished toilets and kitchenettes, raised floors and full air conditioning.
- 04
Around the clock
24-hour reception and security, CCTV and electronic access control.

04Location
Connected to the city.
- 5min
- Drive to the Old Town
- 10min
- Drive to Kraków Główny station, morning peak
05Available Spaces
Room to grow.
Discover flexible workspace opportunities within Orange Office Park.
Explore Available Spaces

